This Midtown Manhattan office building in Herald Square required a major lobby renovation, and total redesign of the entrance way. 4SDI implemented the entire construction renovation and project management, including production of all the custom millwork, stainless steel channeling, glazing, stone tiling, electrical, lighting, security system, lobby entrance way door, and exterior masonry.
- Lobby Entrance Old 512
- Lobby Entrance Stage Two 512
- Lobby Entrance Final 512
Over 68 custom 3/4″ wood veneer panels were milled offsite, including a two-piece custom cherry miter cut curved archway above the upper interior of the lobby entrance way.
Twenty-one LED light boxes of various sizes had to be specially-made and installed to fit between the custom panels and glazing. Forty-two frosted glass panes had to be produced and installed above the custom paneling.
Grey stone tiling was installed as lobby flooring and wainscoting. A custom cherry air vent cover and eight removable stone radiator covers were produced offsite and installed.
- Elevator West Wall View 768
- Interior Custom Archway 1024
- Custom Angular Glazing 512
- Directory Wall 1024
- Air Vent Cover 512
- Stone Radiator Removable Covers 512
Recessed lighting and 8 beautiful brushed chrome cylinder hanging pendants were custom ordered and installed in the drop ceilings. The operation of the complete lighting system including the lightboxes are all remotely controlled by a timer. Prior to doing all the finishing work, a new complete sprinkler system, a new sound system, and new security cameras were added and installed.
To add a wonderful finishing touch, brushed stainless steel elevator panels were installed inside the lobby elevators.
- Hanging cylinder pendant 512
- Brushed Steel elevator panel 512
- Elevator Panel detail 512
A curved custom cherry and stainless steel reception desk with front recessed LED cove lighting was handcrafted and became the crown jewel of the lobby.
The desk was built offsite to accommodate a security monitor system. A touch screen digital directory was installed and programmed and custom fit inside the millwork.
- Brush steel Curved Top 512
- Cove lighted desk 384
- Desk Security Monitor 1024
- Lobby Interior Archway Entrance 384
The major focal point of the project was a 12′ custom glass and brushed stainless steel entrance way door with archway transom to the lobby. This was framed by a special exterior stone archway with keystone, which our stone mason created onsite.
- Before Lobby Interior 384
- Before Inside Archway 512
- Final Inside Archway 512
- Elevator Walkway View 384
Note the radical change before and after, a transformation from old and shoddy to a lobby of exquisite modern beauty and sophistication.
- Final Lobby Interior 768